{"id":3889,"date":"2024-04-02T23:49:03","date_gmt":"2024-04-02T22:49:03","guid":{"rendered":"http:\/\/geometrik.local\/manual\/manual-de-instalacao-e-manutencao-trail15hd\/"},"modified":"2025-07-16T10:25:05","modified_gmt":"2025-07-16T09:25:05","slug":"installation-maintenance-multiflex","status":"publish","type":"manual","link":"https:\/\/geometriktarget.com\/en\/manual\/installation-maintenance-multiflex\/","title":{"rendered":"Multiflex Installation and Maintenance Manual"},"content":{"rendered":"\n<h1 class=\"wp-block-heading has-x-large-font-size\">Multiflex Installation and Maintenance Manual<\/h1>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\">Installation and Maintenance Video<\/h3>\n\n\n\n<!DOCTYPE html>\n<html lang=\"pt-BR\">\n<head>\n    \n    \n    <title>V\u00eddeo Centralizado<\/title>\n    <style>\n        \/* Estilos para dispositivos menores *\/\n        @media (max-width: 767px) {\n            .video-container-mobile {\n                display: block;\n                text-align: center;\n                margin-top: 20px; \/* Ajuste conforme necess\u00e1rio *\/\n            }\n            .video-container-desktop {\n                display: none;\n            }\n            iframe {\n                width: 100%;\n                height: 56.25vw; \/* Altura proporcional para 16:9 *\/\n            }\n        }\n        \/* Estilos para dispositivos maiores *\/\n        @media (min-width: 768px) {\n            .video-container-mobile {\n                display: none;\n            }\n            .video-container-desktop {\n                display: block;\n                text-align: center;\n                margin-top: 50px; \/* Ajuste conforme necess\u00e1rio *\/\n            }\n            iframe {\n                width: 800px;\n                height: 420px;\n                max-width: 100%;\n            }\n        }\n    <\/style>\n<\/head>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube\" style=\"margin-top:0;margin-right:0;margin-bottom:0;margin-left:0\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"How to install sports vinyl roll flooring?\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/I68G0SlS5vw?start=4&#038;feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\">Installation and Maintenance Manual<\/h3>\n\n\n\n<p style=\"margin-top:0;margin-right:0;margin-bottom:0;margin-left:0;padding-top:0;padding-bottom:0;line-height:1.3\">Index<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\" style=\"padding-top:0;padding-bottom:0;line-height:1.3\"><a href=\"#1instalacao\" data-type=\"internal\" data-id=\"#1intalacao\">1. <strong><strong>MULTIFLEX VINYL FLOORING ROLL INSTALLATION<\/strong><\/strong><\/a><\/h2>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><a href=\"#manutencaoalpha\" data-type=\"internal\" data-id=\"#manutencaoalpha\">2. <strong><strong>MULTIFLEX VINYL FLOORING ROLL MAINTENANCE<\/strong><\/strong><\/a><\/h2>\n\n\n\n<div style=\"height:var(--wp--preset--spacing--20)\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity is-style-wide\"\/>\n\n\n\n<h2 class=\"wp-block-heading has-large-font-size\" id=\"1instalacao\">1. <strong><strong>MULTIFLEX VINYL FLOORING ROLL INSTALLATION<\/strong><\/strong><\/h2>\n\n\n\n<p><\/p>\n\n\n\n<p>1. Make sure the base is dry, clean, and free from deformation.<\/p>\n\n\n\n<p>2. If you have an underfloor heating system, turn it off before starting the installation. <br>For safety reasons, we don&#8217;t recommend switching it on again.<\/p>\n\n\n\n<p>3. Unroll the flooring and leave it in the room where it will be installed for 24 hours so it adapts to the room temperature and returns to its flat shape.<\/p>\n\n\n\n<p>4. Before beginning, measure the area to be floored. Plan the installation carefully so you don&#8217;t waste material or end the rows with small portions of flooring.<\/p>\n\n\n\n<p>5. Always leave a 10 mm space between the flooring and the wall or columns.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-large-font-size\">INSTALLATION<\/h3>\n\n\n\n<p>There are two possible systems for installing MultiFlex:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"#semcola\" data-type=\"internal\" data-id=\"#semcola\">Installation using double-sided adhesive tape<\/a>;<\/li>\n\n\n\n<li><a href=\"#comcola\" data-type=\"internal\" data-id=\"#comcola\">Installation using glue.<\/a><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-medium-font-size\" id=\"semcola\">INSTALLATION WITH DOUBLE-SIDED TAPE<\/h4>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>MATERIALS REQUIRED<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"934\" height=\"628\" src=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/Multiflex-NOVO-1_EN.png\" alt=\"\" class=\"wp-image-9902\" style=\"width:600px\" srcset=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/Multiflex-NOVO-1_EN.png 934w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/Multiflex-NOVO-1_EN-300x202.png 300w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/Multiflex-NOVO-1_EN-768x516.png 768w\" sizes=\"auto, (max-width: 934px) 100vw, 934px\" \/><\/figure>\n\n\n\n<p><strong><strong>INSTALLATION<\/strong><\/strong><\/p>\n\n\n\n<p>1 \u2013 Using the X-Acto knife, set square and chalk, make all the required cuts before beginning the installation.<\/p>\n\n\n\n<div class=\"wp-block-columns has-small-font-size is-layout-flex wp-container-core-columns-is-layout-9182c5f4 wp-block-columns-is-layout-flex\" style=\"border-style:none;border-width:0px;border-radius:0px;margin-top:var(--wp--preset--spacing--20);margin-bottom:var(--wp--preset--spacing--20);padding-top:0;padding-right:0px;padding-bottom:0;padding-left:0px;line-height:1.5\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-container-core-column-is-layout-33184554 wp-block-column-is-layout-flow\" style=\"border-style:none;border-width:0px;padding-top:0;padding-right:0;padding-bottom:0;padding-left:0\">\n<figure class=\"wp-block-image aligncenter size-full is-resized has-custom-border\"><img loading=\"lazy\" decoding=\"async\" width=\"673\" height=\"469\" src=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-1-1.png\" alt=\"\" class=\"wp-image-9934\" style=\"border-style:none;border-width:0px;border-radius:0px;width:330px;height:auto\" srcset=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-1-1.png 673w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-1-1-300x209.png 300w\" sizes=\"auto, (max-width: 673px) 100vw, 673px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"674\" height=\"472\" src=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-2-1.png\" alt=\"\" class=\"wp-image-9939\" style=\"width:332px\" srcset=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-2-1.png 674w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-2-1-300x210.png 300w\" sizes=\"auto, (max-width: 674px) 100vw, 674px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p>2 &#8211; Put the double-sided tape on the floor around the installation perimeter, creating a diamond. You\u2019ll need 3 linear metres of double-sided tape for each square metre of MultiFlex.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized has-custom-border is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"673\" height=\"471\" src=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-3.png\" alt=\"\" class=\"wp-image-9951\" style=\"border-style:none;border-width:0px;width:332px\" srcset=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-3.png 673w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-3-300x210.png 300w\" sizes=\"auto, (max-width: 673px) 100vw, 673px\" \/><\/figure>\n\n\n\n<p style=\"padding-top:0;padding-right:0;padding-bottom:0;padding-left:0\">3 \u2013 As the roll is installed on the adhesive tape, remove the top part of the tape so the roll sticks to the floor.<\/p>\n\n\n\n<div class=\"wp-block-columns has-small-font-size is-layout-flex wp-container-core-columns-is-layout-9182c5f4 wp-block-columns-is-layout-flex\" style=\"border-style:none;border-width:0px;border-radius:0px;margin-top:var(--wp--preset--spacing--20);margin-bottom:var(--wp--preset--spacing--20);padding-top:0;padding-right:0px;padding-bottom:0;padding-left:0px;line-height:1.5\">\n<div class=\"wp-block-column is-vertically-aligned-stretch is-layout-flow wp-container-core-column-is-layout-33184554 wp-block-column-is-layout-flow\" style=\"border-style:none;border-width:0px;padding-top:0;padding-right:0;padding-bottom:0;padding-left:0;flex-basis:50%\">\n<figure class=\"wp-block-image aligncenter size-full is-resized has-custom-border\"><img loading=\"lazy\" decoding=\"async\" width=\"597\" height=\"418\" src=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-4.png\" alt=\"\" class=\"wp-image-9962\" style=\"border-style:none;border-width:0px;border-radius:0px;width:330px;height:auto\" srcset=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-4.png 597w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-4-300x210.png 300w\" sizes=\"auto, (max-width: 597px) 100vw, 597px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"598\" height=\"416\" src=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-5.png\" alt=\"\" class=\"wp-image-9967\" style=\"width:332px;height:auto\" srcset=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-5.png 598w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-5-300x209.png 300w\" sizes=\"auto, (max-width: 598px) 100vw, 598px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p style=\"padding-top:0;padding-right:0;padding-bottom:0;padding-left:0\">4 \u2013 Repeat this step for subsequent flooring rolls. Don&#8217;t forget to piece the ends together properly so the joints aren&#8217;t visible. Tip: to ensure the rollers are completely flush, overlay them slightly (about 1mm) and then force them together with a few small taps.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized has-custom-border is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"671\" height=\"468\" src=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-6.png\" alt=\"\" class=\"wp-image-9972\" style=\"border-style:none;border-width:0px;width:332px\" srcset=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-6.png 671w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-6-300x209.png 300w\" sizes=\"auto, (max-width: 671px) 100vw, 671px\" \/><\/figure>\n\n\n\n<p style=\"padding-top:0;padding-right:0;padding-bottom:0;padding-left:0\">5 \u2013 Place heavy objects that don\u2019t mark on the joints for 24 hours. This guarantees the flooring sticks to the adhesive tape.<\/p>\n\n\n\n<p style=\"padding-top:0;padding-right:0;padding-bottom:0;padding-left:0\"><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized has-custom-border is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"675\" height=\"470\" src=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-7.png\" alt=\"\" class=\"wp-image-9977\" style=\"border-style:none;border-width:0px;width:332px\" srcset=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-7.png 675w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-7-300x209.png 300w\" sizes=\"auto, (max-width: 675px) 100vw, 675px\" \/><\/figure>\n\n\n\n<p style=\"padding-top:0;padding-right:0;padding-bottom:0;padding-left:0\"><br><\/p>\n\n\n\n<div style=\"height:12px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"comcola\">INSTALLATION WITH GLUE<\/h4>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>MATERIALS REQUIRED<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"934\" height=\"628\" src=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/Multiflex-NOVO-2_EN.png\" alt=\"\" class=\"wp-image-9908\" style=\"width:600px\" srcset=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/Multiflex-NOVO-2_EN.png 934w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/Multiflex-NOVO-2_EN-300x202.png 300w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/Multiflex-NOVO-2_EN-768x516.png 768w\" sizes=\"auto, (max-width: 934px) 100vw, 934px\" \/><\/figure>\n\n\n\n<div style=\"height:var(--wp--preset--spacing--30)\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>GLUE PREPARATION<\/strong><\/p>\n\n\n\n<p style=\"margin-top:0;margin-bottom:0;padding-top:0;padding-bottom:0;line-height:1.7\">You need around 1kg of glue per m\u00b2.<br><br>Glue has two components: resin and a catalyst. Mix them well and begin the installation immediately.<br><\/p>\n\n\n\n<p>When ready, the glue can be used for 20 to 25 minutes. After, you can no longer use it for the installation.<br><br>Application should be done at a room temperature of between 15 and 25\u00baC and should never drop below 0\u00baC.<\/p>\n\n\n\n<div style=\"height:var(--wp--preset--spacing--30)\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong><strong>INSTALLATION<\/strong><\/strong><\/p>\n\n\n\n<p>1 \u2013 Make all the required cuts before starting to install the flooring.<\/p>\n\n\n\n<p>2 \u2013 Get the glue ready. Use a tool to manually mix the two glue components. Prepare small amounts of glue, as once ready, it must be used quickly.<\/p>\n\n\n\n<p>3 \u2013 Use a notched trowel to spread the glue gradually, then place the MultiFlex on top.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized has-custom-border is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"677\" height=\"479\" src=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-8.png\" alt=\"\" class=\"wp-image-9982\" style=\"border-style:none;border-width:0px;width:332px\" srcset=\"https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-8.png 677w, https:\/\/geometriktarget.com\/wp-content\/uploads\/2024\/04\/multiflex-8-300x212.png 300w\" sizes=\"auto, (max-width: 677px) 100vw, 677px\" \/><\/figure>\n\n\n\n<p>4 \u2013 Repeat this step for subsequent flooring rolls. Don&#8217;t forget to piece the ends together properly so the joints aren&#8217;t visible. Tip: to ensure the rollers are completely flush, overlay them slightly (about 1mm) and then force them together with your hands.<\/p>\n\n\n\n<p>5 \u2013 Then put objects that don\u2019t mark on the joints for 24 hours to guarantee the flooring sticks to the glue.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-large-font-size\" id=\"manutencaoalpha\">2. <strong><strong>MULTIFLEX VINYL FLOORING ROLL MAINTENANCE<\/strong><\/strong><\/h2>\n\n\n\n<p>Flooring maintenance and cleaning are essential to ensure a longer life.<\/p>\n\n\n\n<p>If glue has been used to stick the flooring down, wait 3 days before cleaning with water to allow optimal glue adhesion.&nbsp;<\/p>\n\n\n\n<p>Use a vacuum cleaner to regularly clean any rubbish from the surface. This prevents wear and tear\/damage to the flooring.<\/p>\n\n\n\n<p>For greater hygiene, use a microfibre mop (e.g. a yellow strip mop) together with pH-neutral detergents, which can be found in any supermarket.<\/p>\n\n\n\n<p>Don&#8217;t use sponges, steel wool pads or bleach. These products may scratch and damage your flooring.<br><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Note:<\/strong> The colour of the roll varies depending on the lighting and loses its brightness over time.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Multiflex Installation and Maintenance Manual Installation and Maintenance Video V\u00eddeo Centralizado Installation and Maintenance Manual Index 1. MULTIFLEX VINYL FLOORING ROLL INSTALLATION 2. MULTIFLEX VINYL FLOORING ROLL MAINTENANCE 1. MULTIFLEX VINYL FLOORING ROLL INSTALLATION 1. Make sure the base is dry, clean, and free from deformation. 2. If you have an underfloor heating system, turn [&hellip;]<\/p>\n","protected":false},"featured_media":0,"parent":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-3889","manual","type-manual","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/geometriktarget.com\/en\/wp-json\/wp\/v2\/manual\/3889","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/geometriktarget.com\/en\/wp-json\/wp\/v2\/manual"}],"about":[{"href":"https:\/\/geometriktarget.com\/en\/wp-json\/wp\/v2\/types\/manual"}],"version-history":[{"count":15,"href":"https:\/\/geometriktarget.com\/en\/wp-json\/wp\/v2\/manual\/3889\/revisions"}],"predecessor-version":[{"id":11190,"href":"https:\/\/geometriktarget.com\/en\/wp-json\/wp\/v2\/manual\/3889\/revisions\/11190"}],"wp:attachment":[{"href":"https:\/\/geometriktarget.com\/en\/wp-json\/wp\/v2\/media?parent=3889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}